MADE FOR THE DOGS WHO MADE YOUR LIFE

More walks. More zoomies. More good years. 

50+ happy dogs

A tasty daily chew with 6 vet-formulated joint actives, so your best friend can keep up with every adventure, at every age.

  • Vet formulated
  • Third-party tested

90-Day Money-Back Guarantee

Happy dog with Rewoof Hip & Joint Chews
Veterinarian formulated
Third-party lab tested
Made in USA*
90-day money-back guarantee
“Easier get-ups and stairs after a few weeks”Nicole & Koda “Excited for walks again”Katherin P. & Rocket “Even a picky husky likes them”Bodhi's owner “One chew and zero hassle”Mina & Koe “Keeping up with adventures”Murph's owner

Why it matters

80%

of dogs over 8 show signs of joint issues*

Joint changes build quietly with age, and bigger or more active dogs feel them sooner. Daily support works best when you start early, before the stiffness shows.

100%75%50%25%0% 5 20%6 35%7 48%8 80%Dog age (years)

*Johnston, S.A. (1997). Osteoarthritis. Veterinary Clinics of North America: Small Animal Practice, 27(4), 699–723. doi:10.1016/s0195-5616(97)50076-3

Real dogs, real routines

Small daily chew. Big difference on walks.

Filmed by Rewoof owners, before and after a few weeks of daily chews.

Before
After
★★★★★

Excited for walks again

Katherin P. & RocketVerified owner
Before
After
★★★★★

Noticeable daily progress

Michelle M.Verified owner
Before
After
★★★★★

Back to his daily active routine

Sabina & ChapoVerified owner

Individual results vary.

Real owners

Dog parents say it best

Real customers, real dogs, filmed on their own phones.

Adventure dog
★★★★★

“Hikes, snow, beach… she’s always ready.”

Mochi’s owner
Hip & Joint ChewsFrom $19.37/jar
Try now
One a day
★★★★★

“A real difference in his day.”

Rocket’s owner
Hip & Joint ChewsFrom $19.37/jar
Try now
Daily routine
★★★★★

“For mobility and overall comfort.”

Chapo’s owner
Hip & Joint ChewsFrom $19.37/jar
Try now
Owner video
★★★★★

“1 chew a day and giving it to him is easy”

Koe's owner
Hip & Joint ChewsFrom $19.37/jar
Try now

Individual results vary.

The formula

Healthy joints need more than glucosamine.

A joint is cartilage, cushioning, connective tissue and flexibility working together. That's why every Rewoof chew combines six actives, each with a different job, and prints the exact amount on the label.

Shop Hip & Joint Chews

Amounts per chew. A dog over 75 lbs gets 1,500 mg glucosamine a day from 3 chews.

Glucosamine HCl

Glucosamine HCl

500 mg

Supports cartilage health and structure

MSM

MSM

400 mg

Supports joint comfort and everyday movement

Green-Lipped Mussel

Green-Lipped Mussel

150 mg

Supports mobility and flexibility

Chondroitin Sulfate

Chondroitin Sulfate

110 mg

Supports joint cushioning

Vitamin C

Vitamin C

20 mg

Supports collagen production

Manganese

Manganese

2.5 mg

Supports bone and connective tissue

The joint support gap

Most dogs get far less joint support than they need

Regular dog food has little to no glucosamine, and many supplements stop at a partial serving. Two Rewoof chews give a medium dog 1,000 mg of glucosamine a day, plus MSM, chondroitin and green-lipped mussel.

2×

more glucosamine per day than typical big-box joint chews*

Glucosamine per day medium dog, 25–75 lbs

1,000 mg glucosamine daily
6 joint actives in one chew
Vet-formulated
Third-party lab tested

*Comparison based on typical label servings of popular powder and soft-chew joint supplements for a medium dog. Amounts vary by brand. These statements have not been evaluated by the FDA. This product is not intended to diagnose, treat, cure, or prevent any disease.

How we compare

Rewoof vs. typical joint chews

Rewoof
Typical chews
Chews for a full daily dose
1–3
Often 4–8
Six actives in every chew
6
Usually 2–3
Green-lipped mussel
Exact mg per chew on the label
Often a blend total
Veterinarian formulated
Varies
90-day money-back guarantee

Based on labels of popular joint chews we reviewed in 2026.

How it works

One routine, sized to your dog.

Pick your dog's weight to see their daily dose, how long a jar lasts, and the bundle that fits best. Give with a meal or as a treat.

one jar lasts
glucosamine a day
Shop their supply

Giving more than 1 chew? Split between morning and evening.

Advanced + Complete

Advanced Hip & Joint Chews

Vet-formulatedThird-party tested
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced Hip & Joint Chews
Advanced + Complete

Advanced Hip & Joint Chews

Vet-formulatedThird-party tested
60 chews per jar · Duck flavor
  • Full joint support in just 1–3 chews a day
  • Supports cartilage, mobility & flexibility
  • 500 mg Glucosamine + 400 mg MSM in every chew
Choose your offer
Vet Formulated
Third-Party Tested
Made in USA*

100% Satisfaction Guaranteed

If you're not 100% satisfied, contact us and we'll refund you.

Benefits
  • 500 mg Glucosamine in every chew to support healthy cartilage
  • 400 mg MSM for joint comfort and easier everyday movement
  • Green-Lipped Mussel and Chondroitin to support mobility and joint cushioning
  • Helps relieve occasional discomfort from daily activity
  • Vet-formulated and made in the USA with globally sourced ingredients
  • No artificial colors or flavors, in a duck-flavored chew dogs love
Dosage and weight guide

Consistency is key. Give daily, during or after a meal.

  • Up to 25 lbs: 1 chew daily
  • 25–75 lbs: 2 chews daily
  • Over 75 lbs: 3 chews daily

Giving more than 1 chew a day? Split it between morning and evening.

Nutrition facts

Active ingredients per 1 chew (4 g)

Glucosamine HCl (Shrimp and Crab)500 mg
Methylsulfonylmethane (MSM)400 mg
Perna canaliculus (Green-Lipped Mussel)150 mg
Chondroitin Sulfate (Porcine)110 mg
Ascorbic Acid (Vitamin C)20 mg
Manganese (Mn Proteinate)2.5 mg

Inactive ingredients: Brewers yeast, calcium sulfate, canola oil, citric acid, citrus pectin, glycerin, gum arabic, maltodextrin, mixed tocopherols, natural duck flavor, oat flour, propionic acid, rosemary extract, rye flour, silicon dioxide, sodium alginate, sorbic acid, soy lecithin, vegetable oil, water.

Made with research-backed ingredients

Every chew delivers 500 mg Glucosamine, 400 mg MSM, 150 mg Green-Lipped Mussel and 110 mg Chondroitin. Vet-formulated, third-party lab tested and made in the USA with globally sourced ingredients.

Reviews

Dog parents see the difference.

4.8
from 50+ reviews
Katherin P.
★★★★★

A real difference in his day

Katherin P.· Rocket
Verified
Nicole
★★★★★

Easier get-ups and stairs after a few weeks

Nicole· Koda
Verified
Bodhi's owner
★★★★★

Even a picky husky likes them

Bodhi's owner· Husky, 60 lbs
Verified
Murph's owner
★★★★★

Keeping up with adventures

Murph's owner· Adventure dog
Verified
Cooper
★★★★★

Two sizes, one easy routine

Cooper· Turkey & Sadie
Verified
Mina
★★★★★

One chew and zero hassle

Mina· Koe
Verified

Selected customer reviews. Individual results vary.

Quality

Made with standards you can check.

No proprietary blends, no guesswork. Here's exactly how every jar is made.

Veterinarian formulated

Built around the joint actives vets have recommended for years.

Third-party lab tested

Independently tested for quality and what's on the label.

Made in the USA

With globally sourced ingredients.

GMP & SQF certified facility

Made in an FDA-registered facility.

No artificial colors or flavors

A natural duck flavor dogs actually want.

Exact mg on every label

Every active and amount printed openly. No blends.

Happy dog

See the difference in 90 days, or your money back.

Give Rewoof a real try. If you're not happy with the results, email us and we'll refund you. No returns, no hoops.

  • 90-day money-back guarantee
  • Ships in 1–2 business days
  • Skip, pause or cancel subscriptions anytime
Try Rewoof risk-free

FAQ

Questions, answered.

Still have a question?Email hello@rewoof.co and a real person will get back to you.
How many chews should I give my dog?

Up to 25 lbs: 1 chew a day. 25–75 lbs: 2 chews a day. Over 75 lbs: 3 chews a day. Give with a meal or as a treat, and if you give more than 1 chew, split them between morning and evening.

How soon will I see a difference?

Many owners notice easier get-ups within 2–4 weeks of daily use. Joint support builds with consistency, so give it a full 60–90 days. Every dog is different and results vary.

What's in every chew?

Glucosamine HCl 500 mg, MSM 400 mg, Green-Lipped Mussel 150 mg, Chondroitin Sulfate 110 mg, Vitamin C 20 mg and Manganese 2.5 mg, in a duck-flavored soft chew with no artificial colors or flavors.

Is Rewoof safe for all dogs?

It's made for adult dogs of all sizes. Check with your vet first for puppies under 1 year, pregnant or nursing dogs, and dogs with health conditions or on medication.

Where is Rewoof made?

In the USA, with imported and domestic ingredients, in a GMP and SQF certified, FDA-registered facility. Every batch is third-party lab tested.

How does Subscribe & Save work?

You get an extra 15% off every delivery and free shipping, at the same price each time. Skip, pause or cancel anytime from your account.

When will my order arrive?

Orders ship in 1–2 business days and usually arrive within 3–6 business days in the US.

What if it doesn't work for my dog?

You're covered by our 90-day money-back guarantee. Email hello@rewoof.co and we'll make it right.